Reinforcement of retaining wall

Reinforcement of retaining wall

[Public works]

Reinforcement of retaining wall (Albania)
150 000 m2
Creation of a retaining wall solution with NOTEX C geosynthetic reinforcement.

Pre-consolidation platform for the creation of a road

Pre-consolidation platform for the creation of a road

[Public works]

RD22 - La Chapelle d’Armentières (59)
15 000 m2
During the construction of the RD22 road, soil was identified as compressible. To consolidate the ground, a solution combining vertical drains at a depth of 22 m with the SOMTUBE FTF draining geocomposite was selected.

Waterproofing of motorway ponds

Waterproofing of motorway ponds

[Hydraulic structures]

A63 stormwater ponds - Saint-Geours-de-Maremne (40)
67 000 m2
To ensure the sustainability and waterproofing of the A63 stormwater ponds, a DRAINTUBE® FT solution was implemented. It drains rising groundwater while guaranteeing the waterproofing of the ponds.

Drainage under and within the body of the dike

Drainage under and within the body of the dike

[Hydraulic structures]

Development of controlled flooding field structures - Renty (62)
7 800 m2 (under dike)
As a result of frequent floods, flood storage areas were developed to receive flood waters. SOMTUBE® FTF and DRAINATEX® were used to guarantee the sustainability of the dikes as well as water drainage.

Seawall construction and reinforcement

Seawall construction and reinforcement

[Public works]

LA COUARDE SUR MER seawall - Ile de Ré (17)
1 500 m2
The construction of a protective seawall poses numerous internal stability issues. The NOTEX® GX solution helps address these issues by guaranteeing the stability of the seawall.

Drainage and protection under waterproofing layer

Drainage and protection under waterproofing layer

[Public works]

A22 motorway central reservation - Roncq - Tourcoing (59)
43 000 m2
The waterproof area of the A22 motorway’s central reservation is affected by gas leaks. The DRAINTUBE® FT drainage system was installed to drain gases and guarantee the integrity of the geomembrane.

Drainage in road structure

Drainage in road structure

[Public works]

RN6 - Zinguichor - Tanaff (Senegal)
188 000 m2
The rehabilitation of the RN6 national road, linking Zinguichor to Tanaff (116 km), is affected by rising groundwater from the Casamance river. The SOMTUBE® FTF geocomposite solution was implemented to effectively drain water from the soil.

Road drainage trench earthwork and waterproof culverts

Road drainage trench earthwork and waterproof culverts

[Public works]

A150 motorway - Rouen (76)
18 000 ml
As part of the A150 project in Rouen, the DRAINCOTEX® solution was used for road drainage trench earthwork, combined with STABILINER® ALVEO to create a water barrier, retain earth and revegetate culverts.

Earth retention on landfill capping

Earth retention on landfill capping

[Environment]

Landfill - Salazie (Reunion Island)
30 000 m2
To enable earth retention to a depth of 30 cm, the AFITER® 3D solution was implemented on the slopes of the landfill’s capping dome.